Additions and structural changes require disciplined planning. We coordinate engineering, permits, inspections and the construction sequence so every load path, connection and building-envelope detail is addressed.

Residential wall reframing
Existing room opened and reframed around a bank of windows.
Tick the pieces you want and we'll carry them straight into your quote request.
Do you provide the engineering?
We coordinate it. Structural drawings are stamped by an independent engineer and the cost is shown as its own line in your quote.
How long do permits take?
In the Ottawa area, expect roughly 4–10 weeks from application to issued permit for an addition, depending on drawings and review load.
Tell us about the space, priorities and timeline. We'll review the project, define the scope and provide a written quote you can make a decision on.